(Including: the main building, the business building and the annex building, of which the main building has 41 floors above ground, which is mainly used for installing telecommunications facilities; the 5 floors above the business building are mainly used for telecommunications operations; the 5 floors above the annex building are mainly restaurants, pump rooms and refrigeration. Computer room; the main building, business building and annex have two underground floors, mainly for civil air defense, process entry room and garage with a total construction area of ??about 92,000 square meters. Preface??3 Chapter 1 System Design?5??1.1 Design Criteria Construction Management and Control??35 Chapter 10 Testing??
This document includes the following attachments:
This system software is mainly used by system integration scheme producers to
Issues in tender offers for numerous products. Due to the system integration scheme, many products are used,
It is complicated, and a project often needs to produce multiple schemes. How to make the enterprise’s scheme produce professional
level, how to ensure that there will be no calculation errors in the amount, it is the main responsibility of the scheme producers
To work. I think this is also the most troublesome problem for every scheme producer, because the following problems
It will often confuse everyone:
1. Often a large-scale project will be reviewed by business leaders multiple times, so there will always be costs and
The relational data of the quotation, otherwise it is difficult to determine the profit ratio of the project
2. In order to prevent malicious price competition before bidding, equipment providers generally
The final quotation will be given the night before the tender submission, so that everyone has no time to recalculate
Calculate what price to bid
3. How to make the inquiry form in the hands of the inquirer completely the same as the designer before making the bidding document?
sample, and let its inquiry records be submitted in written mode (to prevent errors in the inquiry,
It is difficult to purchase equipment at this price later)
4. It often occurs in the bidding site that the price is reduced again, or the equipment plan is changed, such as
How to analyze cost and project quotation in real time
5. After winning the bid, how to let the inquirer get the price of the equipment before the bid accurately, so as to facilitate
Negotiate the purchase price with upstream manufacturers again
6. It is inconvenient for general construction personnel to see the bidding quotation, so how to quickly organize a
A list of equipment to facilitate its construction and equipment acceptance
…….
In order to solve the above problems rationally, we developed the "Quotation Star" system integration bidding quotation score.
analysis system. The system is mainly to facilitate users to make proposal quotations, analyze costs, profits in real time,
At the same time, a system list form is generated to coordinate other departments of the enterprise to work together.
At the same time, a system list form is generated to coordinate other departments of the enterprise to work together.
archive file
archive file
Note: "Quotation Star" is the first industry software that only focuses on "IT system integration solution quotation"....)