(The success or failure of each project design depends on the coordination preparation, which is determined by the location of the computer room, the exchange of the management department or the coordination of the on-site architect, and the relevant manufacturers. The site needs to use the relevant diagrams, and then analyze, design and design the construction project according to the diagrams. And set the size and area of ??the machine room, construction instructions and construction configuration drawings.)