(Example plan description, a more detailed network integrated wiring plan with reference quotations, not to say too much, first look at a catalog, everyone down and then tell the truth! The core computer room is located on the fourth floor of the building, 1-3 floors are not considered, and the floors are connected with twisted pairs. The external optical fiber enters the host room on the fourth floor, and the large logarithmic voice cable also enters the host room. At present, the total design of the whole building: total information points: 648 points. Where data points: 486 points. Voice points: 162 points. Contents 1. System overview 1.1 Building structure 1.2 Wiring demand status...3.6 Subsystem between equipment rooms 4. Engineering data list and quotation 5. Program overview 6. Product introduction)