找回密码
 立即注册
The布线wiring系统 | 教育系统应用 2022-08-27 77 0star收藏 版权: . 保留作者信息 . 禁止商业使用 . 禁止修改作品
1、设计范围培尔学院的网管核心位于图书馆大楼的3楼,目前有教工宿舍、外语核心、图书馆大楼以及教学楼需要与核心连接成校园网,并且各楼分别需要网络布线以建设楼内局域网。2、设计目标的确定??大家为该校园网设计的综合布线系统将基于以下目标:1)??符合当前和长远的信息传输要求。2)??布线系统设计遵从G际(ISO/CEI11801)标准。3)??布线系统采用G际标准建议的星形拓扑结构。4)??考虑电脑网络的速度向100Mbps发展的需要。5)??布线系统的信息出口采用G际标准的RJ45插座。6)??布线系统符合综合业务数据网的要求。7)??布线系统要立足开放原则。

(1. Design scope The network management core of Peier College is located on the 3rd floor of the library building. At present, there are staff dormitories, foreign language cores, library buildings and teaching buildings that need to be connected to the core to form a campus network, and each building requires network wiring to construct buildings. Intranet. 2. Determination of design goals? The integrated wiring system we design for the campus network will be based on the following goals: 1)?? Meet the current and long-term information transmission requirements. 2) The design of the wiring system complies with the international (ISO/CEI11801) standard. 3) The wiring system adopts the star topology recommended by international standards. 4)?? Consider the need for the development of the speed of the computer network to 100Mbps. 5) The information outlet of the wiring system adopts the international standard RJ45 socket. 6) The wiring system meets the requirements of the integrated service data network. 7) The wiring system should be based on the principle of openness.)

[下载]13520578388.rar




上一篇:光纤收发器介绍
下一篇:宽带小区接入方案