(Based on the rotation office mechanism, the network characteristics under the random scheduling model are studied, the connection between the total number of valid nodes and points and the number of rotation periods in the network is analyzed, and a dynamic adjustment of the number of valid nodes and points in the network is proposed. probabilistic algorithms. The algorithm can well manage the network function in the later stage of the network due to the reduction of the number of effective nodes and the fixed office probability.)