(The horizontal subsystem includes the overall wiring from the floor wiring room to the information socket in the work area, so it is also called the wiring subsystem. This is the largest and most messy subsystem in the PDS, enabling information to extend to every corner of every room. It generally adopts a star structure, and runs along the floor, wall foot, corner or ceiling.)